The Defense Feed
◆ Daily brief~50 curated defense dispatches every morning. In 5 minutes.Read today →

◆ Archive

This article is older than 7 days and has rolled off the live feed. It remains permanently available in the archive.

LandNorth America

US Army Clears 150 km ER GMLRS Rocket for Production After M270A2 Operational Tests

The US Army approved Milestone C for Lockheed Martin's Extended-Range Guided Multiple Launch Rocket System, authorizing the transition to production and fielding after soldier-led operational tests at White Sands Missile Range. The September and October 2026 trials fired both alternative-warhead and unitary-warhead rounds in succession from an M270A2 launcher. ER GMLRS is designed to reach up to 150 kilometers while retaining compatibility with HIMARS and M270 launchers. Lockheed Martin announced the production transition on October 19, although a first-unit fielding date and initial deployment quantity have not been disclosed.

◆ Every week in your inbox

Get the essential defense signals of the week — one email, Monday morning, curated summaries across land, naval, air, drones, space, cyber, institutional and industry.

No account required. Unsubscribe in one click.

Prefer a full account? Sign up for the daily feed · Preview it first

◆ More from today's feed

See all →

Explore this beat